Phi refit was commissioned to carry out an important intervention on this 2019 Amer 100. The client's requests were a complete painting of the hull and superstructures and a modification of the internal layout.
As part of the painting work, once the hull was brought to 0, two coats of primer and two coats of antifouling were applied. A Prop Speed treatment was also performed on the propellers.
With regard to the superstructures, the work carried out involved sanding, resining and repairing the cracks present, and then moving on to applying the primer, undercoat and topcoat. Polishing and application of new silicones completed the intervention.
As regards the works that involved the spaces below deck, the initial configuration envisaged 4 guest cabins and a transformation work was carried out which converted two of the original cabins into a study and lounge.
Among the objectives of the intervention there was also the improvement of the soundproofing of the premises. In particular, interventions were made with sound-absorbing panels to solve the problem of noise diffusion between the owner's cabin and the galley and between the two guest cabins.
Finally, on the occasion of this refitting, a new latest generation domotics was installed on board, capable of allowing all the parameters to be checked remotely via the App and photovoltaic panels and an additional battery pack were installed in order to make the boat is energetically autonomous.